| Grade | Pipe Body | Tool Joint | |||||
| Min. Yield Strength | Min. Tensile Strength | Charpy V-notch Longitudinal Impact Toughness, Full Size, 21°C (Avg/Min) | Min. Yield Strength | Min. Tensile Strength | Hardness (BHN) | Charpy V-notch Longitudinal Impact Toughness, Full Size, 21°C (Avg/Min) | |
| 75 | 75 ksi | 95 ksi | 40/35 ft-lb | 120 ksi | 140 ksi | 285–341 | 40/35 ft-lb |
| 517 MPa | 655 MPa | 54/47 J | 827 MPa | 965 MPa | 54/47 J | ||
| 90 | 90 ksi | 105 ksi | 40/35 ft-lb | 120 ksi | 140 ksi | 285–341 | 40/35 ft-lb |
| 621 MPa | 724 MPa | 54/47 J | 827 MPa | 965 MPa | 54/47 J | ||
| 110 | 110 ksi | 125 ksi | 40/35 ft-lb | 120 ksi | 140 ksi | 285–341 | 40/35 ft-lb |
| 758 MPa | 862 MPa | 54/47 J | 827 MPa | 965 MPa | 54/47 J | ||
| 120 | 120 ksi | 130 ksi | 40/35 ft-lb | 120 ksi | 140 ksi | 285–341 | 40/35 ft-lb |
| 827 MPa | 896 MPa | 54/47 J | 827 MPa | 965 MPa | 54/47 J | ||
| 130 | 130 ksi | 140 ksi | 40/35 ft-lb | 130 ksi | 140 ksi | 302–363 | 40/35 ft-lb |
| 896 MPa | 965 MPa | 54/47 J | 896 MPa | 965 MPa | 54/47 J | ||
nspection → End upsetting → Integral heat treatment → Pipe straightening → Pipe inspection (leakage, ultrasonic) → Physical and chemical testing → Finished pipe inspection → Cold straightening → Pipe end machining
Tool joint material incoming inspection → Sawing and forging (if necessary) → Joint upsetting → Joint marking → Joint heat treatment → Joint Brinell hardness testing → Physical and chemical testing → Ultrasonic inspection
Make-up/break-out test (if necessary) → Phosphating → Magnetic particle inspection → Joint marking → Cold rolling (if necessary) → Finished joint inspection → Joint thread machining → Joint profile machining
Final joint inspection
Drill pipe & joint end face preparation → Friction welding → Weld post-heating → Weld flash removal → Weld heat treatment (quenching, tempering) → Physical and chemical testing → Weld finishing → Magnetic particle inspection
Ultrasonic inspection → Finished product inspection → Hardbanding (if necessary) → Internal coating (if necessary) → Measuring, weighing and marking → Final inspection → Packaging → Delivery